Racetrack -Front Stretch Renovations Phase 1
alpineco
Renovate front stretch grandstand at Richmond Raceway Phase 1. Demolished existing retaining wall, asphalt, chain link fence and hauled off-site 6,426 cubic yards of excess material. Raised existing manholes, water valves and drainage grates. Installed new asphalt for Food Court Area, 3,694 cubic yards of concrete paving, 445 linear feet of brick paver boarders, 676 linear feet of curb and 85 linear feet of trench drain. Power washed and painted 9 bays of existing Grand Stands and 3 sets of Stair Towers. Installed 16,466 square feet of UltraRib Drip Shield Cladding under grand stands. Remodeled existing men’s and woman’s restrooms with new fixtures, partitions and paint.